41CrS4 · 10B38
Collaborative development of special materials in alignment with project requirements.
Professional Capabilities 01 / 05 · Material Development
When conventional grades cannot meet the requirements, collaborate with steel mills to develop chemical composition, smelting routes, and delivery conditions, and organize trial production and application validation.
The customer’s requirements
The part’s strength, ductility, heat treatment, or processing requirements necessitate further coordination of material conditions.
Starting from raw-material standards, actual usage conditions, and acceptance criteria, we confirm differences and validation items one by one.
If the customer already has target part specifications, the material, feed form, and delivery condition need to be jointly determined.
Development approach
Review part drawings, intended use, currently used materials, forming processes, and subsequent heat treatments to pinpoint the specific issues that need to be addressed.
Together with the steelmaker, assess composition, steelmaking and wire-rod conditions; Creation Group develops a processing plan covering annealing, drawing and surface treatment.
Organize trial production and testing; have the customer validate based on actual parts and operating conditions, then confirm the technical agreement and delivery terms.
Projects and Case Studies
Current development projects involve the following materials. Specific compositions, processes, and supply conditions are confirmed for each individual project.
Collaborative development of special materials in alignment with project requirements.
Organize material plans and trial production verification around the part’s application and processing conditions.
For certain special projects, trial production can begin with approximately 200 kg; suitability must be confirmed in conjunction with the steel plant’s production schedule, material conditions, and technical agreements.
Verification and Confirmation
Initiate project communication
For materials already available, initial discussions can proceed; any unclear conditions will be further confirmed by both parties.
A development project does not automatically mean the material is directly substitutable. The specific material, trial-production quantities, performance characteristics, and supply terms shall be governed by the technical review and the mutually agreed technical agreement.
Back to top ↑